PortfolioSports/Recreation/Event Back to Sports/Recreation/Event Portfolio
  Previous Project | Next Project
Hilltop Center
Location: Saugatuck, MI
Size: 24,000 Sq. Ft.
Construction Type: Conventional Steel, Pre-Engineered Steel
Project Scope: New Construction
Delivery Method: Design/Build
Start Date: June 2000
Completion Date: January 2001
Description:

This 24,000 square foot facility features a unique rotunda shape for indoor putting and chipping combined with pre-engineered wings for golf simulators, offices, conference rooms, library, and kitchen areas. The galvanized exterior is complemented with multiple glass curtain walls. In the winter the rotunda includes sloped concrete with artificial turf for indoor golf. In the summer the turf is covered with a wood floor enabling the building to be used for receptions and banquets. An indoor garden with waterfall is a focal point for this one-of-a-kind structure.